Where the bandgap sits in our tile
The bandgap is the first block in the analog chain. Everything else on the tile takes its current from bias_gen, and bias_gen takes its voltage from us. If VREF is wrong, the clock doubler delay, both output buffers and the DAC all move with it.
Signal context
dig_top ↔ analog/bandgapA bandgap adds two voltages that drift in opposite directions with temperature. VBE of a bipolar transistor falls by about 2 mV/K. The difference ΔVBE between two transistors at different current densities rises in proportion to absolute temperature. With the right weights the drifts cancel and the sum sits near 1.2 V.
In a classic bandgap, resistor ratios set the weights. Here capacitor ratios do it. Charge is sampled onto capacitors in one clock phase and dumped onto a feedback capacitor in the next. Capacitor ratios match well and need no large resistors.
- VREF only drives gates (
bias_geninput,out_bufinput). A sampled-and-held output is fine for that. - The 50 MHz harness clock is already in
dig_top. The phase sequencer goes there as RTL, so students cross the digital/analog boundary on purpose. - No spare analog pin:
ua[0..2]are taken. We observe the bandgap only throughout_bufonua[0]. - The block has its own small bias core and start-up. It cannot borrow current from
bias_gen, becausebias_gendepends on VREF.
Changes from the generic plan
to agree with the mentor in week 1| Generic plan said | For this tile | Why |
|---|---|---|
| Own 2x2 tile, 2 analog pins | Shares the 1x2 tile (~160 × 225 µm); no own pin | ARCHITECTURE.md: ua[0] VREF via out_buf, ua[1] bias, ua[2] DAC |
| 6-bit PTAT trim | 4-bit bg_trim in BG_CTRL (already in regmap). BG_CTRL bits [6:4] are free for a 5th bit or a mode bit | Keeps the register map stable; Step 1 shows what 4 bits buy |
| Separate measurement buffer | Reuse out_buf instance 1 | Already in the architecture, biased from bias_gen |
| External clock + sequencer in the block | bg_seq RTL inside dig_top; phases cross into the analog block | Digital non-overlap is exact and testable in cocotb |
| New register for modes | Proposed BG_SEQ @ 0x08: [2:0] div_sel, [3] burst, [7:4] hold_exp. STATUS [1] bg_valid | Needs a regmap entry. Reset value 0x04 = continuous, 5.12 µs slot |
bg_ok from the analog block | bg_ok = analog bias_ok AND sequencer valid, combined and synchronised in dig_top | An SC reference is only valid after a few clean updates |
Working specification
targets, not predictions| Item | Target | Set by |
|---|---|---|
| Supply | 1.8 V (VDPWR) | TT 1x2 analog template |
| VREF | ≈ 1.2 V at code 8 | CA/CF = 1 (Step 3) |
| Temperature coefficient after trim | < 50 ppm/°C, 0–85 °C | Trim LSB + curvature (Step 1) |
| Sampled noise | < 1 mV rms | Unit cap size (Step 4) |
| Phase slot | 0.32–41 µs, default 5.12 µs | OTA settling (Step 5) |
| Current, continuous mode | ≤ 15 µA (burst: ≤ 4 µA) | Bias core + OTA (Steps 5–6) |
| Area | ≈ 80 × 90 µm budget | Mostly the MIM array (Steps 4, 7) |
| Load | gates only, < 0.5 pF wiring | bias_gen + out_buf inputs |
Words you will meet (glossary)
| CTAT / PTAT | Complementary / proportional to absolute temperature. VBE is CTAT, ΔVBE is PTAT. |
| Virtual ground | The OTA input node X. Feedback holds it at a fixed voltage, so charge that arrives there must go onto CF. |
| Auto-zero | The OTA is put in unity feedback during φ1, so its offset is stored on the capacitors and subtracted in φ2. |
| Non-overlap | A short gap where all switches are open between φ1 and φ2, so no capacitor is ever shorted to two sources at once. |
| Charge injection | When a MOS switch opens, its channel charge spills onto the capacitors. It looks like an offset. |
| kT/C noise | Every time a switch opens on a capacitor, a random voltage of √(kT/C) is frozen on it. |
| Common centroid | Placing the units of matched devices so each group has the same centre of gravity. Linear process gradients then cancel. |
| DRC / LVS / PEX | Design-rule check (can it be made), layout-versus-schematic (is it what you drew), parasitic extraction (what wires add). |
| Guard ring | A ring of substrate or well contacts around a device. It soaks up stray currents and keeps the substrate potential defined. |
Done when
Temperature cancellation
Before any switch or capacitor exists, decide the weights. Move the trim code and watch the curve rotate around its peak. A process shift in VBE moves the best code, and that is why the trim exists.
With N = 8, ΔVBE ≈ 54 mV and rises 0.18 mV/K. VBE falls about 2 mV/K, so CB must be about 11× CA. The curve stays bowed even at the best code. That curvature comes from the ln(T) term in VBE and no linear trim removes it.
- Device:
sky130_fd_pr__pnp_05v5_W3p40L3p40, the vertical substrate PNP. Its collector is the substrate, so it is always diode-connected to ground. It is a fixed layout cell: you place it, you do not draw it. - Classic array: 3 × 3, Q1 in the centre and Q2 = the 8 around it, N = 8 with a common centroid. Step 2 shows the cell itself and denser options.
- The model below is the textbook one (VG0 = 1.17 V, η = 4). Replace it with your own ngspice sweep of the sky130 PNP in week 1.
- Trim: CB = 36 + code units, code =
bg_trim[3:0].
Trim explorer
C_A = C_F = 4 units · C_B = 36 + codeWhat to take away. One LSB moves the slope by about 35 ppm/°C, so after trimming you are within roughly ±18 ppm/°C of the optimum, plus curvature. That meets the 50 ppm/°C target over 0–85 °C. For better, use a free BG_CTRL bit for a 5th trim bit, with half-size LSB units in the array.
Week-1 ngspice: characterise the PNP yourself
* pnp_sweep.spice — V_BE and ΔV_BE of the 1:8 pair versus temperature
.lib /path/to/sky130A/libs.tech/ngspice/sky130.lib.spice tt
.param ie=1u
* two copies of one cell, at 8I and at I = the time-shared PNP (Step 2, option D)
I1 0 e1 {8*ie}
I2 0 e2 {ie}
XQ1 0 0 e1 sky130_fd_pr__pnp_05v5_W3p40L3p40 m=1
XQ2 0 0 e2 sky130_fd_pr__pnp_05v5_W3p40L3p40 m=1
.control
set wr_singlescale
let t = -40
while t le 125
option temp = $&t
op
echo "$&t $&v(e1) $&v(e2)" >> pnp_vs_t.txt
let t = t + 5
end
.endc
.end
Check the PNP subcircuit pin order in the PDK model file before trusting the netlist. Fit VBE(T) and paste your 27 °C value and slope into the explorer above.
Done when
The PNP pair: inside the cell, and denser options
The classic layout puts nine PDK fixed cells in a 3 × 3 grid, Q1 in the middle and Q2 around it. Below is what one of those cells is made of, taken from the PDK GDS. After that we ask how many of its terminals our circuit really needs, and how much smaller a custom layout can get.
SKY130 has no real bipolar process for this. The PNP is a parasitic vertical PNP that comes free with CMOS. The P+ diffusion of a PMOS source becomes the emitter, the n-well becomes the base, and the p-substrate under everything is the collector.
Holes injected by the emitter cross the thin well and are swept into the substrate. That makes the collector the global substrate, VSS, in every PNP on the chip. You cannot wire it anywhere else. That is why this device is always used as a diode (base and collector grounded).
pnp_05v5_W3p40L3p40: cell 6.70 × 6.70 µm, emitter 3.40 × 3.40 µm, n-well 5.17 µm square.pnp_05v5_W0p68L0p68: cell 3.98 × 3.98 µm, emitter 0.68 × 0.68 µm. Every ring sits at the same distance from the cell edge, so cell = emitter + 3.30 µm.- Rings from outside in: P+ tap (collector, 0.505 µm wide), 0.13 µm gap to the n-well, N+ tap (base, 0.36 µm wide, 0.18 µm inside the well), then 0.345 µm to the emitter.
- The emitter comes out on met1. Base and collector stay on li1. A marker layer
PNPID(82/44) covers the whole cell and tells LVS this is a PNP. - Model (W3p40): IS = 7.1·10⁻¹⁸ A, β ≈ 16.6, rb = 73 Ω, re = 5.4 Ω. It has a mismatch term on IS, so Monte Carlo works.
Cross-section through the centre
W3p40L3p40 · x to scale · depth not to scaleThe emitter current (holes, orange arrows) goes down through the base into the substrate and returns through the P+ collector ring. Only about 1/17 of it leaves as base current through the N+ ring. That ring is close to the emitter (0.345 µm) to keep the base resistance low.
Top view of the fixed cell
Outlines, rings and the emitter are exact from the GDS. The licon positions on the rings are drawn on a regular pitch and are approximate.
How many nodes does the pair really have?
answer: three, not four| Terminal | Q1 (1×) | Q2 (8×) | Can it be merged physically? |
|---|---|---|---|
| Collector | VSS | VSS | Already is. It is the p-substrate, shared by every PNP and every NMOS on the chip. The P+ rings only collect the current locally. |
| Base | VSS | VSS | Yes. Both bases are grounded, so all emitters can sit in one n-well with one base contact system. This is the main freedom a custom layout has. |
| Emitter | E1 | E2 (8 islands) | E1 with E2: no. Their difference is ΔVBE, the signal. Q2's eight islands with each other: they are already one net in metal. Merging their diffusion into one 8× emitter gives a geometry with no model, and LVS rejects it, because the emitter area must be 0.46 or 11.56 µm². |
So the pair is 3 nodes: E1, E2, VSS. The base and collector rows are where the area goes, and that is what a custom layout can share. The densest option goes further and removes E2 altogether (option D below).
Layout options, drawn to the same scale
Use a single fixed cell and switch its emitter current: 8·I during φ1 and I during φ2. In φ1 both capacitors sample VBE(8I). In φ2 the emitter falls to VBE(I), and the difference on CB is exactly ΔVBE = (kT/q)·ln 8. The capacitors stay the same. CB can be wired straight to the emitter, so S3 and S4 disappear (Step 3).
- No BJT mismatch. There is only one transistor.
- The 1:8 ratio comes from 9 cascoded unit current sources in one row with dummies,
D U U U U 1 U U U U D. A ratio error ε gives ΔVBE = (kT/q)·ln(8(1+ε)). That is still PTAT, so the trim absorbs it. - The units are steered, never switched off: the "1" always goes to the emitter, and the other 8 go either to the emitter (φ1) or to a dummy PNP held near VBE. The mirror gate never sees a step, and every unit sees the same VDS in both phases.
- Rotating which unit is "the 1" each frame (dynamic element matching) is off by default. Each capture overwrites CH, so the rotation shows up as a 9-frame pattern of about 4 mV rms on VREF, not as an average.
- CA now samples VBE at 8I, about 54 mV higher. That only moves the trim point (Step 1, VBE slider).
- The emitter node must re-settle each phase: τ = (VT/I)·CB ≈ 115 ns at I = 0.5 µA, so 7 τ ≈ 0.8 µs of a 2.5 µs window. No decap on the emitter. The current changes only inside the dead time (
i8_en, Step 6).
- Keeps the 3 × 3 common centroid but puts all nine emitters in one n-well. B keeps an N+ base strip between emitters, at the same 0.345 µm the PDK cell uses, so each emitter sees the environment the model was fitted in.
- The strips also sink stray holes between neighbouring emitters, which sit 54 mV apart. Without them (option C), lateral injection between E1 and E2, and the larger base resistance at the centre, add errors the model does not know about.
- LVS risk: the KLayout deck finds emitters per P+ island with the right area, so B probably extracts as 9 devices. Magic's extractor identifies a PNP by its whole well region and checks the area, so a shared well may extract wrongly. Test a 2-emitter cell with both tools on day 1 before drawing the real one.
- Abutting fixed cells (option A) leaves only 0.26 µm between neighbouring P+ rings. Overlap the rings so they merge, or space them, and let DRC decide.
What the switched 1:8 mirror costs
option D against option A · hand estimates| A · 3×3 array | D · one PNP, 8I / I | Penalty for D | |
|---|---|---|---|
| Area | 404 + ≈ 20 µm² (1:1 mirror) | 45 + ≈ 100 (units) + ≈ 40 (switches) + 16 (dummy PNP) → ≈ 250–300 µm² with wiring | The saving shrinks from 89 % to about 30–40 % |
| Bias current | 2·I | 9·I (the 8 extra units run all the time) | 4.5×. At I = 0.5 µA: 4.5 µA, against a burst budget of ≤ 4 µA |
| Static ratio error | 1:1 mirror + BJT IS mismatch | 1:8 mirror only. σ(ε) ≈ 1.5 % for 1 × 4 µm units → ≈ 0.4 mV on ΔVBE, ≈ 4 mV at VREF (0.3 trim step) | About equal. Both are PTAT and trimmed; ≈ 8 ppm/°C of drift may remain |
| Settling | Emitter nodes nearly fixed | Emitter steps 54 mV per phase, τ = (VT/I)·CB | 0.8 µs at 0.5 µA; tight (1.6 µs) at 0.25 µA |
| Resistive drops (re 5.4 Ω, rb 73 Ω) | Q2 at I/8: negligible | ≈ 77 µV extra on ΔVBE at 8I (I = 1 µA) → ≈ 0.7 mV at VREF | Half that at 0.5 µA; mostly trimmed |
| Rotation (DEM) | — | 9-frame pattern, ≈ 4 mV rms on VREF | Keep off unless VREF is averaged into ≈ 8 × CH |
Assumed PMOS AVT ≈ 5 mV·µm and gm/ID ≈ 6 for the units. Confirm with a Monte Carlo run in week 1.
Recommendation for this tile: option D at I = 0.5 µA, with DEM off. It wins on risk: it uses the PDK cell exactly as delivered (no model or LVS question) and has no BJT mismatch. It does not win much on area once the mirror is counted, and it draws more bias current. Win back current in burst mode: the 8 extra units are needed only in φ1, so power them from ota_en and switch them off during hold. If the burst-mode current budget becomes the deciding number, option A at 2·I is the lower-power choice. If the class wants the custom-layout exercise, draw option B as a second test structure. Don't put it in the signal path until both LVS tools agree on it.
Day-1 test: does a shared well survive LVS?
- In Magic, place one
pnp_05v5_W3p40L3p40. Flatten it (flatten), copy the emitter, li1 and met1 to the right, and widen the n-well, N+ ring and P+ ring so both emitters sit in one well with an N+ strip between them. KeepPNPIDover all of it. - Schematic: two
pnp_05v5_W3p40L3p40with B and C on VSS and separate emitters. - Run Magic
extract all; ext2spice lvs; ext2spiceand netgen, and the KLayout LVS deck. Both must report 2 devices of the right model with matching nets. - If either one fails, use option A or D for the tapeout and keep the test cell for the record.
Done when
The switched-capacitor core
Step through one frame. In φ1 the capacitors sample VBE while the OTA stores its own offset. In φ2 the change in charge lands on CF. Turn the OTA imperfections up and see which ones the circuit cancels.
Phase stepper
Write the charge on every plate touching X at the end of φ1, then at the end of φ2. Nothing else connects to X, so the two are equal:
VX is the same in both phases, so Vcm and the offset drop out. CF has its far plate on ground in φ1 rather than on Vcm. That detail is what makes Vcm cancel, so Vcm can come from a plain resistor divider.
- Transmission gates (
nfet_01v8+pfet_01v8) for nodes between 0.3 and 1.3 V: S1 at VE, S6, S7, S8. - With one time-shared PNP (Step 2, option D), CB sits on the emitter in both phases, so it is wired straight there: no S3/S4 and no charge injection from them.
- A single NMOS is enough for switches to ground (S2, S5).
- Minimum length, W ≈ 0.5–1 µm. Big switches inject more charge. Size for Ron·C ≪ slot time, no larger.
- Bottom plate rule: the MIM bottom plate (met3) has the larger parasitic to substrate. Connect it to the driven side (switch side). The top plate (capm) goes to node X.
- Stretch: open S5/S7 one clock before S1 (an early φ1e). The injected charge then no longer depends on the signal.
Done when
MIM array: size, matching and placement
VREF depends only on capacitor ratios, so the array layout is where accuracy is won or lost. Paint your own placement, add a process gradient, and compare it with the naive row-by-row layout.
Build every capacitor from identical unit cells. Then a ratio is a ratio of integers, and edge effects scale with it. Thickness gradients across the die add a linear error. If every group has its centre of gravity in the middle of the array, those errors cancel to first order.
A ring of dummy units around the array makes the outer cells see the same surroundings as the inner ones. The unit size trades three things: area, kT/C noise and random mismatch.
sky130_fd_pr__cap_mim_m3_1: bottom plate met3, top plate capm, contacted with via3 to met4. About 2 fF/µm². Do not usecap_mim_m4_2, because its top plate needs met5, which Tiny Tapeout reserves.- Square units, same orientation, same via pattern on every unit, dummies included.
- Route the top plates (node X) on met4 inside the array. Bring the bottom plates out on met3/met2 to the switches.
- SKY130 publishes no MIM mismatch coefficient. The 1 %·µm default below is an assumption. Treat the σ result as a sensitivity estimate, not a yield number.
Array painter
8 × 8 core + dummy ring = 10 × 10Done when
OTA and settling budget
Size the amplifier from what the charge transfer needs: enough loop gain for a small static error, and enough bandwidth to settle inside one phase slot. The feedback factor β is small, about 1/14, because CB is large. That is what makes this demanding.
During φ1 the OTA sits in unity feedback (β = 1), so it must also be stable there. A two-stage Miller OTA with enough phase margin at β = 1 is the safe and well-taught choice. A 5-transistor OTA reaches only about 35 dB here, which gives about 15 % gain error.
- Two-stage Miller, NMOS or PMOS input pair from
nfet_01v8/pfet_01v8. Use L ≥ 0.5 µm in the pair and mirrors for gain and matching. - Vcm ≈ 0.9 V from a resistor divider (
res_xhigh_po) or a diode stack. It cancels, so precision does not matter. - Output swing must cover Vcm (φ1) and VREF ≈ 1.25 V (φ2).
ota_engates the tail current. When disabled, the output must go high-Z or to a known level while S6/S8 are open.- The emitter moves 54 mV every phase (option D). Do not add decoupling there: it only slows settling, τ = (VT/I)·(CB + Cnode).
Settling calculator
first-cut numbers, verify in simulationAssumes Cu = 50 fF, CA = CF = 4 u, CB = 44 u, Miller Cc ≈ 0.5·CL,eff, total OTA current ≈ 4 × ID of one input device, slew allowed 30 % of the slot.
Done when
Sequencer and low-power burst mode
The phases are made in dig_top from the 50 MHz clock. Continuous mode refreshes VREF every frame. Burst mode does one update, switches the OTA off and lets CH hold VREF. Hot leakage then decides how long you can wait.
Timing and power
- φ1 and φ2 are never high together. Here there are 2 clock periods (40 ns) of dead time at every slot edge.
capopens one clock before φ2 ends. Otherwise CH sees the OTA output after its feedback opens.ota_enrises one slot before φ1 after a hold, so the OTA is awake when sampling starts. It also powers the 8 extra current units, so they are off during hold.i8_enis high for the whole φ1 slot, so the emitter current switches between 8·I and I inside the dead time, never while S1, S7 or S6 is closed.validneeds 4 completed updates after enable.bg_ok=validAND a synchronisedbias_ok.bg_enlow resets everything, so start-up is always from a known state.
- Phases leave the hardened macro as 1.8 V logic. Re-buffer them inside the bandgap with local inverters, which also give the complements the transmission gates need.
- Make the φ1 and φ2 buffer chains identical, so their delays match and the 40 ns gap survives.
- Route phase lines on met2 with a grounded met1/met3 neighbour where they pass node X.
- Test it in cocotb: assert that
phi1 & phi2is never 1 and thatcapfalls beforephi2.
bg_seq.v sketch (simulate before you trust it)
Done when
Layout, for your first custom analog block
Work outside-in and matched-first. Fix the block outline and pins, place the devices that must match, then route the sensitive nodes, then everything else. Run DRC after every hour of drawing, not at the end.
Suggested floorplan
≈ 80 × 90 µm, scale approximateThe procedure
tick as you goSet up the tools once
PDK sky130A (installed with volare/ciel), xschem, ngspice, Magic, netgen, KLayout. Open Magic with the PDK rules:
magic -rcfile $PDK_ROOT/sky130A/libs.tech/magic/sky130A.magicrcDraw the outline and the pins first
Agree the box size and pin order with the
tt_analog_topowner. Draw the boundary, then the pins as labels on met2/met3 at the edge. Port names must match the xschem symbol exactly, because LVS compares by name.Place the devices that must match
Use Magic's sky130 device generators (Devices menu) for transistors and the MIM unit, and the fixed PNP cell. Order: the PNP cell and its dummy PNP, the current-source row
D U U U U 1 U U U U D, the MIM unit cell, then copy the unit 100 times following your Step 4 map, then the OTA input pair and mirrors.- Same orientation for matched transistors (gate direction and current direction).
- Dummy fingers at both ends of each matched row.
- OTA pair: ABBA or common-centroid 2×2, same distance to the tail.
Taps and guard rings
Every NMOS region needs a nearby P-tap to VSS, and every n-well needs an N-tap to VDD (or its source). Put a P+ guard ring around the PNP array and another around the OTA. Keep the phase buffers in their own ring at the block edge.
Route the sensitive nodes yourself, first
Node X (top plates → OTA input) is the most sensitive wire in the block. Every femtofarad to a phase line injects charge each cycle. Keep it short, on met4 inside the array, with a grounded neighbour. Then VREF and CH, then the BJT emitters.
Route the rest and the supply
met1 inside cells, met2 horizontal, met3 vertical. Supply rails wide (≥ 1.5 µm) with many vias. Long single-layer gate wires break the antenna rule. Jump to a higher metal near the gate, or add a diode.
Extract and run LVS
# in Magic, with sc_bandgap loaded extract do local extract all ext2spice lvs ext2spice -o sc_bandgap_lvs.spice # in a shell netgen -batch lvs "sc_bandgap_lvs.spice sc_bandgap" \ "../xschem/sc_bandgap.spice sc_bandgap" \ $PDK_ROOT/sky130A/libs.tech/netgen/sky130A_setup.tcl lvs.logRead
lvs.logfrom the bottom: "Circuits match uniquely" is the goal. Pin mismatches usually mean a label on the wrong layer. Device-count mismatches usually mean a missing tap or a shorted net.Parasitic extraction and post-layout simulation
extract all ext2spice lvs ext2spice cthresh 0 ext2spice -o sc_bandgap_pex.spiceSwap the schematic for
sc_bandgap_pex.spicein the same testbenches (Step 8). Compare Cp at X with the Step 3 stepper. Pay attention to every number that moved by more than 1 mV.Hand over to the top level
Deliver
sc_bandgap.mag(and GDS), the LVS netlist and a one-page note: pins, supply current per mode, required phase timing, known limits. The top-level owner places it intt_analog_topand reruns DRC/LVS for the whole tile, plus the Tiny Tapeout precheck.
Mistakes almost everyone makes the first time
- Label on the wrong layer: the label sits on met1 but the wire is met2, so LVS sees an unconnected port.
- MIM plates swapped: the bottom plate on node X adds ~10–20 % parasitic to substrate, which lowers β and adds substrate noise.
- Floating n-well under a PMOS. It passes DRC and fails silicon. LVS catches it only if the schematic bulk pin is right.
- Mirrored matched devices: one transistor is flipped, so their currents flow in opposite directions and tilt effects add instead of cancelling.
- Running DRC only at the end: 3 000 errors on day 20. Run it every hour.
- Editing the schematic after layout without re-running LVS: always rerun both after any change, however small.
- Using met5 because it was free in the layer list. It belongs to the Tiny Tapeout power grid.
Verification matrix and four-week schedule
Every test runs twice: on the schematic and on the extracted netlist. Measure in phase-aligned windows. Report mean, ripple and droop separately, because a clock artefact can look like temperature drift.
Schedule
Test matrix
sch = schematic · pex = extracted| Test | Sweep | Record | Pass (proposed) | Run on |
|---|---|---|---|---|
| Temperature × trim | −40…125 °C, codes 0–15, tt/ss/ff | Mean VREF, best code, residual curvature | Best code in 2…13 at every corner; TC < 50 ppm/°C (0–85) | sch, pex |
| Supply | 1.62–1.98 V | Mean VREF, ripple | < 5 mV/V | sch, pex |
| Slot timing | div_sel 0…4 | Smallest slot that settles | div_sel 4 settles with margin at ss/125 °C; note the smallest that does | sch, pex |
| Current ratio (option D) | Unit mismatch Monte Carlo, I = 0.25–1 µA | ΔVBE error, emitter settling per phase | Settled within the slot at I = 0.5 µA; error inside the trim range | sch, pex |
| Start-up | VDD ramps 1 µs…1 ms, bg_en toggles | Time to bias_ok and valid | Always starts; no stuck state | sch, pex |
| Burst / hold | hold_exp 0…12, 27 and 125 °C | Droop, refresh step, average current | Droop < 1 mV at the chosen hold_exp | pex |
| Clock stop | clk halts in each phase | VREF behaviour, clean restart | No latch-up of the state; recovers in 4 frames | sch |
| Load | bias_gen + out_buf input, ua[0] pad 5 pF + 500 Ω | Kick-back on VREF, settled value at pin | Pin within 2 mV of internal VREF | pex |
| Mismatch / sensitivity | Monte Carlo where models exist; ±0.5 % cap ratio otherwise | Spread of best code | 3σ fits in the trim range | sch |
Fallback if week 2 slips. Keep continuous mode as the default. Drop burst mode and BJT power gating before cutting any verification. A reference that works in continuous mode still serves the tile. A half-verified burst mode can stop the whole analog chain.